Product Description
Rivet Diameter (mm) |
Rivet Length (mm) |
Brim Diameter (mm) |
Eyehole Diameter (mm) |
Riveting Scope (mm) |
Tensile Strength (N) |
Shear Strength (N) |
2.4 |
6 |
4.8-5.0 |
2.5 |
1.5-3.5 |
255 |
172 |
7 |
2.5-4.5 |
8 |
3.5-5.5 |
10 |
5.5-7.5 |
3.2 |
6 |
6.0-6.2 |
3.3 |
1.0-3.0 |
450 |
360 |
8 |
3.0-5.0 |
10 |
5.0-7.0 |
12 |
7.0-9.0 |
14 |
9.0-11.0 |
16 |
11.0-13.0 |
18 |
13.0-15.0 |
20 |
15.0-17.0 |
4.0 |
6 |
7.8-8.0 |
4.1 |
1.0-2.5 |
750 |
540 |
8 |
2.5-4.5 |
10 |
4.5-6.5 |
12 |
6.5-8.5 |
14 |
8.5-10.5 |
16 |
10.5-12.5 |
18 |
12.5-14.5 |
20 |
14.5-16.5 |
22 |
16.5-18.5 |
4.8 |
8 |
9.2-9.5 |
5.0 |
2.0-4.0 |
1050 |
935 |
10 |
4.0-6.0 |
12 |
6.0-8.0 |
14 |
8.0-10.0 |
16 |
10.0-12.0 |
18 |
12.0-14.0 |
20 |
14.0-16.0 |
22 |
16.0-18.0 |
25 |
18.0-21.0 |
30 |
21.0-26.0 |
Material:
CODE |
RIVET |
STEM |
AA |
Aluminium |
Aluminium |
AS |
Aluminium |
Steel |
Head Style |
Dome ,Large Flange Head |
RAL .NO.
RAL 7035 RAL 9003 RAL9001 RAL7046 RAL5015 RAL3026 RAL1021 RAL6024
RAL1003 RAL1019 RAL2001 RAL2010 RAL3009 RAL5000 RAL5003 RAL7004
The setting process
- Drill hole and select the correct nozzle
- Open too and place stem in tool ,Place rivet in the hole
- Squeeze rivet gun once or twice until stem snaps ,Open rivet gun and turn upside down until stem falls out
PLEASE FOLLO INSTRUCTION TO ENSURE A PROFER FINISH
- Unless fastening-tool can not go in,The riveting works must be conducted from the side where drilling has been made ,Which will prevent the flange (Rivet head ) from flashes due to drilling
- When metallic materials are fastened with non metallic materials such as Plywook ,plastics or fabrics ,the riveting works must be conducted on the metallic side ,and in order to secure a rigid riveting ,Large flange rivets is recommended
- When fastening with a thin material ,thinner than than 0.5mm ,the riveting must be done on the face of thin material
Package & Shipping
Company Profile
Quality control devices
Certifications
Our trade shows
Our Advantages
- Free mold opening
- Free drawing
- Fast delivery
- Non-standard customization
- Adequate inventory
- Quality guarantee
- MOQ negotiable
FAQ
1) Are you a trade company or factory ?
Re:We are a factory
2) What is your delivery time ?
Re: For samples order we need 1-3 working days ,bulk order we need 7-15 working days after your payment
3) How to do ODM order ?
Re:Just sending the picture ,technical drawing or as well as prototype you have ,then our engineers will estimate it and let you know asap
4)How about your quality control system ?
Re:we have completed quality control system ,and will check the products one by one before shipment
5)What is your main market ?
Re : We are mainly on Europe,Asia and North America market
6)Can i get free samples ?what are the rules of samples in your company ?
Re:Yes , Samples can be free for standard item ,qty 10-20pcs but customer pay for the freight ,for Non-standard item,customer has to pay for mold fee and freight